Decking / sheathing replacement
Pre-existing condition.
| Code reference | IRC nailable deck requirement |
|---|---|
| Rests on | building code |
| Measured in | SF |
How to answer it
Photographs from BEFORE and AFTER tear-off. Post-tear-off-only evidence is routinely refused.
Put this in the supplement before they ask
Deck condition cannot be observed until the covering is removed, so the quantity is established at tear-off rather than at inspection.
What you need in the file
- photo BEFORE tear-off
- photo AFTER tear-off
Writing this into a supplement?
ScopeQueue reads the carrier estimate and your roof photos and writes the items the estimate left off, each with the reason behind it and the measurement it rests on. Your first file is free.