Overhead & Profit (10% + 10%)
(a) You self-perform. (b) Gutters are the same trade as roofing. (c) This is a roofing-only project and no general contractor is supervising it.
| Rests on | industry practice |
|---|---|
| Measured in | % |
How to answer it
Answer with the coordination the job actually needs, not with a count of trades. Set out the separate scopes of work in this job, who schedules each one, who sequences them against each other, and who carries the result. The trade-group check is a drafting check and not the test: putting every line in one trade group produces the rejection by itself, so give each trade its own group. WARNING — the written test in the carrier guideline on file is whether the complexity of the job would reasonably require general contractor coordination, and that same guideline excludes a roofing-only project when no general contractor supervises it (Citizens Property Insurance, 2023 Best Claims Practices and Estimating Guidelines, p. 26). No three-trade threshold appears anywhere in that document. Do not argue a trade count as though it were the carrier's own rule; state the coordination facts and let them stand.
What you need in the file
- list of separate scopes of work in this job
- who schedules and sequences each trade
- subcontractor bids itemized for material and labor
Writing this into a supplement?